previous next
[36] of mechanics, were detailed to cooperate. A number of colored mechanics, picked up in the neighborhood, were also brought into use. The bridge was a truss structure of one hundred and ninety feet span, and cost nearly one hundred thousand dollars. Five weeks would have been allowed to build such a work, with all the materials at hand for the purpose. It required two days to remove the debris of the old wreck. He commenced work on Monday morning. An old secession fort near the place furnished timber, and the iron rods were cut up into fastenings to secure the upright supports upon the old posts. On Friday evening the track was complete over the creek, and on Saturday every thing was ready for a train of fifty tons' weight to pass over.--Baltimore American, April 11.

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 3.0 United States License.

An XML version of this text is available for download, with the additional restriction that you offer Perseus any modifications you make. Perseus provides credit for all accepted changes, storing new additions in a versioning system.

hide Places (automatically extracted)

View a map of the most frequently mentioned places in this document.

hide Dates (automatically extracted)
Sort dates alphabetically, as they appear on the page, by frequency
Click on a date to search for it in this document.
April 11th (1)
hide Display Preferences
Greek Display:
Arabic Display:
View by Default:
Browse Bar: