previous next

[317]

communication completed Railroad Bridge Across the Ravine of Running Water at Whiteside, Tennessee. In this picture stands one of the most notable of the almost incredible achievements of army engineers in the Civil War. Between Whiteside and Wauhatchie the railroad on its way in Chattanooga curves southward almost along the boundary of Alabama, and the destroyed bridge at Whiteside had to be replaced before trains could be run into Chattanooga, which was to be held as a Federal military post and base for future operations in Georgia. Here, fourteen miles from Chattanooga, the engineers built this four-tier trestle-bridge, 780 feet long and 116 feet high in the center, completing the work in a remarkably short time toward the close of 1863. Plans for Sherman's Atlanta campaign were already formulating and it was necessary that this bridge in its isolated position should be strongly held. The Camp of the Federal detachment constantly on guard here is seen in the picture, and two of the four double-cased blockhouses, which served as refuges from any attack.

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 3.0 United States License.

An XML version of this text is available for download, with the additional restriction that you offer Perseus any modifications you make. Perseus provides credit for all accepted changes, storing new additions in a versioning system.

hide Places (automatically extracted)
hide People (automatically extracted)
Sort people alphabetically, as they appear on the page, by frequency
Click on a person to search for him/her in this document.
Whiteside (1)
W. T. Sherman (1)
hide Dates (automatically extracted)
Sort dates alphabetically, as they appear on the page, by frequency
Click on a date to search for it in this document.
1863 AD (1)
hide Display Preferences
Greek Display:
Arabic Display:
View by Default:
Browse Bar: