hide Sorting

You can sort these results in two ways:

By entity
Chronological order for dates, alphabetical order for places and people.
By position (current method)
As the entities appear in the document.

You are currently sorting in ascending order. Sort in descending order.

hide Most Frequent Entities

The entities that appear most frequently in this document are shown below.

Entity Max. Freq Min. Freq
William Wells 22 2 Browse Search
Charles Brooks 20 2 Browse Search
Benjn Hall 19 1 Browse Search
William Wilkins Warren 18 0 Browse Search
Sterling Konisky Sawyer 18 0 Browse Search
New England (United States) 16 0 Browse Search
South River, Ga. (Georgia, United States) 16 0 Browse Search
Sarah H. Wait 14 0 Browse Search
L. Osgood 14 0 Browse Search
James Hayward 14 0 Browse Search
View all entities in this document...

Browsing named entities in a specific section of Medford Historical Society Papers, Volume 20.. Search the whole document.

Found 87 total hits in 55 results.

1 2 3 4 5 6
Chelmsford, Mass. (Massachusetts, United States) (search for this): chapter 10
ground. Upon these the masonry of the dam was built, while a double row of sheet piling was driven, within which the concrete core or backbone of the structure was filled, and back of this, the slope. Even the old Middlesex canal, discontinued ten years before, was laid under tribute, as the puddle of its old embankments near by, made up fifty years earlier, consisting of one-eighth clay mixed with sand and gravel, was used in this work. The granite for the overfall had been quarried at Chelmsford, as had been the stone for the canal's aqueducts. At this stage of the work labor troubles were evident, as one hundred and thirty men struck for twenty-five cents addition to the daily wage. On June 2, 1863, Albert Whiting took charge of the masonry construction. His experience on the dry docks at Norfolk and Charlestown, and at Fort Independence, qualified him for this important work. On the tenth of June the northeast corner-stone of the dam was laid, but we find no record of any
Mystic River (Massachusetts, United States) (search for this): chapter 10
d beside the brick conduit to Sherman street) conveys the water to Arlington. There, a mile up the valley of Sucker brook, is a pumping station that supplies the water tower at the heights for the high service. The Mystic dam remains intact; indeed, if it were removed it is questionable if such would be a wise procedure. It has been suggested that an additional elevation be made, and thus the improvement of the Aberjona. Mystic dam is16.25 Flow of dam6 —— Original level of Aberjona river10.25 Feet above river2 —— Symmes' meadow12.25 Communication of A. E. Whitney. The elevation proposed would raise the upper lake to 17.50 feet above Boston base, or fifteen inches higher than the tailrace of the next then existing water power on the Aberjona. The highest level the water commission could maintain is 16.25 feet, and is marked by a copper bolt in the Aberjona bridge. During more recent years that stream has been dredged and much improved by the town of Winchester,
Middlesex Canal (Massachusetts, United States) (search for this): chapter 10
in 1862, the changes that resulted in the two lakes of the present time. At that time the shores of the pond were well wooded, and the white oaks there growing were utilized for the piles, that were driven fourteen feet and cut off level three feet below the surface of the ground. Upon these the masonry of the dam was built, while a double row of sheet piling was driven, within which the concrete core or backbone of the structure was filled, and back of this, the slope. Even the old Middlesex canal, discontinued ten years before, was laid under tribute, as the puddle of its old embankments near by, made up fifty years earlier, consisting of one-eighth clay mixed with sand and gravel, was used in this work. The granite for the overfall had been quarried at Chelmsford, as had been the stone for the canal's aqueducts. At this stage of the work labor troubles were evident, as one hundred and thirty men struck for twenty-five cents addition to the daily wage. On June 2, 1863, Albe
Spot Pond (Massachusetts, United States) (search for this): chapter 10
polluted by the factory drainage of Woburn and Winchester, its use for domestic service was at once abandoned. For a time it was kept in commission for emergency, but this was not for long. The engine last installed was taken to the works at Spot pond and the newer boilers removed. The others remained for some time, and within a few years have gone to the junk dealers, as also the three duplex pumps that used to have extra duty on Monday, when Charlestown, like other places, had that as was and enough of it by gravity, instead of this eternal pumping. But he did not forsee the end that came in time rather than in eternity. Not all the extensive construction is now useless, however. The reservoir on the hill is connected with Spot pond (which was raised several feet higher) and the water flows downward through the force main to the gate-house in West Medford, where an iron main (laid beside the brick conduit to Sherman street) conveys the water to Arlington. There, a mile up
Bunker Hill (West Virginia, United States) (search for this): chapter 10
and of the men in May, 1863, seems to have been acceded to, as we find that on April 9, 1864, another strike occurred, and that ten days later the men returned at the same wage as before, $1.50 per day. On May 2, 1864, their pay was raised to $1.65, and even this did not conciliate, for on June 1 another strike occurred. The laborers then got notice that the permanent men would get $1.66 and the transients $1.50 per day. The dam was finished on June 17, 1864, just eighty-nine years after Bunker hill day, and the pond began to fill. Water was not the only thing to rise, as we note that on July 1 the laborers' pay was increased to $1.80 per day, and no strike is mentioned. These were the days of the Civil War, when the high cost of living was equally apparent with present-day experience. At 1.30 A. M., September 30, 1864, the stop planks were put permanently into the dam and the water allowed to rise to the required elevation. This changed the entire shore line, shape and extent
Baconville (Massachusetts, United States) (search for this): chapter 10
s' History of 1855:— The lands on each side are slightly elevated, and in future times will doubtless be filled with country seats. Today sees something of fulfilment of his prophecy. Writing over sixty years ago he did not foresee the electric light or railway on the farther side, nor yet the broad parkway on the other, or the swift automobiles almost momentarily traversing its course. The present limits of its Medford border are only within a few years invaded by dwellings, but the Baconville of which he wrote, the Upper Medford of his earlier days, now styled Wedgemere, since 1850 a part of Winchester, more than fulfils his forecast by the beautiful residences there erected. Not a few of these have their motor-boat house on the water's edge, and near the Aberjona a lighthouse adds to the attractive view. Along the Arlington side the street cars pass, and the many passengers obtain at Morningside an unobstructed view across the lake in either direction. Here tasteful resi
Fort Independence (Massachusetts, United States) (search for this): chapter 10
s earlier, consisting of one-eighth clay mixed with sand and gravel, was used in this work. The granite for the overfall had been quarried at Chelmsford, as had been the stone for the canal's aqueducts. At this stage of the work labor troubles were evident, as one hundred and thirty men struck for twenty-five cents addition to the daily wage. On June 2, 1863, Albert Whiting took charge of the masonry construction. His experience on the dry docks at Norfolk and Charlestown, and at Fort Independence, qualified him for this important work. On the tenth of June the northeast corner-stone of the dam was laid, but we find no record of any formal ceremony, other than the placing of a small vial containing the names of Charlestown's mayor, water commission, engineers and contractor in the lewis hole of the lower stone. In sealing the vial, a new cent of that year's coinage was embedded in the wax; not a heavy investment, rather an expression of old-time sentiment that still obtains at
Norfolk (Virginia, United States) (search for this): chapter 10
bankments near by, made up fifty years earlier, consisting of one-eighth clay mixed with sand and gravel, was used in this work. The granite for the overfall had been quarried at Chelmsford, as had been the stone for the canal's aqueducts. At this stage of the work labor troubles were evident, as one hundred and thirty men struck for twenty-five cents addition to the daily wage. On June 2, 1863, Albert Whiting took charge of the masonry construction. His experience on the dry docks at Norfolk and Charlestown, and at Fort Independence, qualified him for this important work. On the tenth of June the northeast corner-stone of the dam was laid, but we find no record of any formal ceremony, other than the placing of a small vial containing the names of Charlestown's mayor, water commission, engineers and contractor in the lewis hole of the lower stone. In sealing the vial, a new cent of that year's coinage was embedded in the wax; not a heavy investment, rather an expression of old
Medford (Massachusetts, United States) (search for this): chapter 10
The Mystic water-works. THESE water-works are those built a half century ago by the (then) city of Charlestown for its own supply, and located mainly within, and traversing the entire length of, Medford. The Register has already described a portion and, as then intimated, now completes the story. The Mystic lakes of today, with their surroundings, would have an unfamiliar look to Medford people of sixty years agone. There was then really but one, and that was known as Medford pond, though the Narrows, or Partings, did all nature could to make two of it. The city of Charlestown, in its quest of a water supply, took it over, and then were begun, in 1862, the changes that resulted in the two lakes of the present time. At that time the shores of the pond were well wooded, and the white oaks there growing were utilized for the piles, that were driven fourteen feet and cut off level three feet below the surface of the ground. Upon these the masonry of the dam was built, wh
James McDonald (search for this): chapter 10
of Rev. Mr. Miles and after a few words introduced the Mayor of the City, who after a short speech, received a spade and placed a sod in a wheelbarrow. Mr. Lawrence then made a speech and placed another sod in the wheelbarrow, after which Mr. James McDonald the contractor wheeled the sods away and placed them on the site of the embankment. The President of Aldermen, Chairman of Common Council, Chief engineer, six ex-Mayors, and others were introduced and spoke, each placing a sod in the wheelhanan's about the wheeling away of these numerous sods, but in another column is the testimony of an eye-witness. Mr. Lawrence invited those present to his home, where a collation was served, thus ending the formal beginning of the work. Mr. McDonald sublet the construction of the embankment and reservoir to Charles Linehan. Engineer Buchanan made an interesting record of the manner of its construction and of the difficulties encountered. Springs were encountered near the westerly corner