hide Sorting

You can sort these results in two ways:

By entity
Chronological order for dates, alphabetical order for places and people.
By position (current method)
As the entities appear in the document.

You are currently sorting in ascending order. Sort in descending order.

hide Most Frequent Entities

The entities that appear most frequently in this document are shown below.

Entity Max. Freq Min. Freq
William Wells 22 2 Browse Search
Charles Brooks 20 2 Browse Search
Benjn Hall 19 1 Browse Search
William Wilkins Warren 18 0 Browse Search
Sterling Konisky Sawyer 18 0 Browse Search
New England (United States) 16 0 Browse Search
South River, Ga. (Georgia, United States) 16 0 Browse Search
Sarah H. Wait 14 0 Browse Search
L. Osgood 14 0 Browse Search
James Hayward 14 0 Browse Search
View all entities in this document...

Browsing named entities in a specific section of Medford Historical Society Papers, Volume 20.. Search the whole document.

Found 87 total hits in 55 results.

1 2 3 4 5 6
June, 1870 AD (search for this): chapter 10
to test it; on the 22nd into some of the distribution pipes, and on the 25th the Commissioner and some 40 invited guests inspected the works. On November 29 the celebration of the introduction of water took place, consisting of a long procession through some of the principal streets, exercises at Winthrop square that were closed by letting the water on the fountain, and subsequently by a grand dinner at the City Hall. The writer well remembers his first visit to the pumping station in June, 1870, and the walk over the decaying aqueduct of the canal, that still spanned the river. It was the show place of the vicinity, and a record book was kept for the visitors to sign. The two duplex pumping engines, resplendent in their polished steel and brass, were encased in equally polished walnut, and one was steadily at work day and night. Mr. Born and Mr. Hines arrived from Brooklyn on July 18, 1864, to erect them, and the former remained as engineer during the entire use of the works.
November 29th (search for this): chapter 10
at 6.30 P. M. they were again started and water was first pumped into the northerly division of the reservoir. On the 11th the concreting of the southerly division was completed, and on the 15th the last stone of the coping was laid. On the 14th the engines pumped steadily all day from 10.15 A. M. On the 17th water was let into the feed main to test it; on the 22nd into some of the distribution pipes, and on the 25th the Commissioner and some 40 invited guests inspected the works. On November 29 the celebration of the introduction of water took place, consisting of a long procession through some of the principal streets, exercises at Winthrop square that were closed by letting the water on the fountain, and subsequently by a grand dinner at the City Hall. The writer well remembers his first visit to the pumping station in June, 1870, and the walk over the decaying aqueduct of the canal, that still spanned the river. It was the show place of the vicinity, and a record book wa
d risen in the lake 3 1/2 feet. On the same day the pumping engines were started slowly, at first pumping air only. A few leaks were discovered and the engines were stopped. On the 10th at 6.30 P. M. they were again started and water was first pumped into the northerly division of the reservoir. On the 11th the concreting of the southerly division was completed, and on the 15th the last stone of the coping was laid. On the 14th the engines pumped steadily all day from 10.15 A. M. On the 17th water was let into the feed main to test it; on the 22nd into some of the distribution pipes, and on the 25th the Commissioner and some 40 invited guests inspected the works. On November 29 the celebration of the introduction of water took place, consisting of a long procession through some of the principal streets, exercises at Winthrop square that were closed by letting the water on the fountain, and subsequently by a grand dinner at the City Hall. The writer well remembers his first v
l doubtless be filled with country seats. Today sees something of fulfilment of his prophecy. Writing over sixty years ago he did not foresee the electric light or railway on the farther side, nor yet the broad parkway on the other, or the swift automobiles almost momentarily traversing its course. The present limits of its Medford border are only within a few years invaded by dwellings, but the Baconville of which he wrote, the Upper Medford of his earlier days, now styled Wedgemere, since 1850 a part of Winchester, more than fulfils his forecast by the beautiful residences there erected. Not a few of these have their motor-boat house on the water's edge, and near the Aberjona a lighthouse adds to the attractive view. Along the Arlington side the street cars pass, and the many passengers obtain at Morningside an unobstructed view across the lake in either direction. Here tasteful residences crown the heights above, and the vine-clad garages of You-Say, and the sun-parlors and
record before alluded to:— On November 5, 1864, the water had risen in the lake 3 1/2 feet. On the same day the pumping engines were started slowly, at first pumping air only. A few leaks were discovered and the engines were stopped. On the 10th at 6.30 P. M. they were again started and water was first pumped into the northerly division of the reservoir. On the 11th the concreting of the southerly division was completed, and on the 15th the last stone of the coping was laid. On the 14th the engines pumped steadily all day from 10.15 A. M. On the 17th water was let into the feed main to test it; on the 22nd into some of the distribution pipes, and on the 25th the Commissioner and some 40 invited guests inspected the works. On November 29 the celebration of the introduction of water took place, consisting of a long procession through some of the principal streets, exercises at Winthrop square that were closed by letting the water on the fountain, and subsequently by a grand d
September 30th, 1864 AD (search for this): chapter 10
laborers then got notice that the permanent men would get $1.66 and the transients $1.50 per day. The dam was finished on June 17, 1864, just eighty-nine years after Bunker hill day, and the pond began to fill. Water was not the only thing to rise, as we note that on July 1 the laborers' pay was increased to $1.80 per day, and no strike is mentioned. These were the days of the Civil War, when the high cost of living was equally apparent with present-day experience. At 1.30 A. M., September 30, 1864, the stop planks were put permanently into the dam and the water allowed to rise to the required elevation. This changed the entire shore line, shape and extent of the upper lake, and as the water backed into the tributary Aberjona, the mouth of that stream (sometimes called Symmes' river) became fixed at the bridge below the Bacon mills. There was a water privilege that was rendered useless by the construction of the Mystic dam. The proprietors of course claimed damage and made sh
angular line of the Somerville boundary is very near, and within recent years closely built upon. We quote again from the record before alluded to:— On November 5, 1864, the water had risen in the lake 3 1/2 feet. On the same day the pumping engines were started slowly, at first pumping air only. A few leaks were discovered and the engines were stopped. On the 10th at 6.30 P. M. they were again started and water was first pumped into the northerly division of the reservoir. On the 11th the concreting of the southerly division was completed, and on the 15th the last stone of the coping was laid. On the 14th the engines pumped steadily all day from 10.15 A. M. On the 17th water was let into the feed main to test it; on the 22nd into some of the distribution pipes, and on the 25th the Commissioner and some 40 invited guests inspected the works. On November 29 the celebration of the introduction of water took place, consisting of a long procession through some of the principa
ountry may be had and is well worth the time and effort of any one. It lies entirely within the bounds of Medford, though the angular line of the Somerville boundary is very near, and within recent years closely built upon. We quote again from the record before alluded to:— On November 5, 1864, the water had risen in the lake 3 1/2 feet. On the same day the pumping engines were started slowly, at first pumping air only. A few leaks were discovered and the engines were stopped. On the 10th at 6.30 P. M. they were again started and water was first pumped into the northerly division of the reservoir. On the 11th the concreting of the southerly division was completed, and on the 15th the last stone of the coping was laid. On the 14th the engines pumped steadily all day from 10.15 A. M. On the 17th water was let into the feed main to test it; on the 22nd into some of the distribution pipes, and on the 25th the Commissioner and some 40 invited guests inspected the works. On Nov
r strike occurred, and that ten days later the men returned at the same wage as before, $1.50 per day. On May 2, 1864, their pay was raised to $1.65, and even this did not conciliate, for on June 1 another strike occurred. The laborers then got notice that the permanent men would get $1.66 and the transients $1.50 per day. The dam was finished on June 17, 1864, just eighty-nine years after Bunker hill day, and the pond began to fill. Water was not the only thing to rise, as we note that on July 1 the laborers' pay was increased to $1.80 per day, and no strike is mentioned. These were the days of the Civil War, when the high cost of living was equally apparent with present-day experience. At 1.30 A. M., September 30, 1864, the stop planks were put permanently into the dam and the water allowed to rise to the required elevation. This changed the entire shore line, shape and extent of the upper lake, and as the water backed into the tributary Aberjona, the mouth of that stream (so
May 2nd, 1864 AD (search for this): chapter 10
s been attempted in our own and neighboring cities. The basal construction at this point was found difficult, as a centrifugal pump discharging four hundred and fifty gallons per minute failed to keep the excavation dry. A year and a week elapsed ere the work was complete. The demand of the men in May, 1863, seems to have been acceded to, as we find that on April 9, 1864, another strike occurred, and that ten days later the men returned at the same wage as before, $1.50 per day. On May 2, 1864, their pay was raised to $1.65, and even this did not conciliate, for on June 1 another strike occurred. The laborers then got notice that the permanent men would get $1.66 and the transients $1.50 per day. The dam was finished on June 17, 1864, just eighty-nine years after Bunker hill day, and the pond began to fill. Water was not the only thing to rise, as we note that on July 1 the laborers' pay was increased to $1.80 per day, and no strike is mentioned. These were the days of the C
1 2 3 4 5 6