hide Sorting

You can sort these results in two ways:

By entity
Chronological order for dates, alphabetical order for places and people.
By position (current method)
As the entities appear in the document.

You are currently sorting in ascending order. Sort in descending order.

hide Most Frequent Entities

The entities that appear most frequently in this document are shown below.

Entity Max. Freq Min. Freq
William Wells 22 2 Browse Search
Charles Brooks 20 2 Browse Search
Benjn Hall 19 1 Browse Search
William Wilkins Warren 18 0 Browse Search
Sterling Konisky Sawyer 18 0 Browse Search
New England (United States) 16 0 Browse Search
South River, Ga. (Georgia, United States) 16 0 Browse Search
Sarah H. Wait 14 0 Browse Search
L. Osgood 14 0 Browse Search
James Hayward 14 0 Browse Search
View all entities in this document...

Browsing named entities in a specific section of Medford Historical Society Papers, Volume 20.. Search the whole document.

Found 87 total hits in 55 results.

1 2 3 4 5 6
vation the embankments of the canal, and at their end, beneath the water, the lower courses of the aqueduct masonry, a reminder of the canal's prosperous days. These mark the channel of the Aberjona as it was prior to the raising of the lake, but elsewhere the course is now a matter of conjecture, unless, indeed, old maps or plans may be in evidence. More or less litigation resulted from the flowage, but this was nothing new, as witness case of Symmes vs. Dunster, Broughton and Collins in 1656 [Register, Vol. XIII, p. 12], when the Mystic was first dammed. While this work was in progress some information relative to the lower lake was obtained, which we quote:— An experiment was made by Engineer Buchanan to ascertain the depth at which the water in the lower pond becomes salt. A copper wire coated with silver was suspended from a float anchored in 54 feet of water. The wire was allowed to remain in the water 24 hours, and was found to be very slightly discolored from 18 or
versing the entire length of, Medford. The Register has already described a portion and, as then intimated, now completes the story. The Mystic lakes of today, with their surroundings, would have an unfamiliar look to Medford people of sixty years agone. There was then really but one, and that was known as Medford pond, though the Narrows, or Partings, did all nature could to make two of it. The city of Charlestown, in its quest of a water supply, took it over, and then were begun, in 1862, the changes that resulted in the two lakes of the present time. At that time the shores of the pond were well wooded, and the white oaks there growing were utilized for the piles, that were driven fourteen feet and cut off level three feet below the surface of the ground. Upon these the masonry of the dam was built, while a double row of sheet piling was driven, within which the concrete core or backbone of the structure was filled, and back of this, the slope. Even the old Middlesex cana
May, 1863 AD (search for this): chapter 10
investment, rather an expression of old-time sentiment that still obtains at corner-stone layings. We hardly think any vandals will undertake to make away with this particular coin, as has been attempted in our own and neighboring cities. The basal construction at this point was found difficult, as a centrifugal pump discharging four hundred and fifty gallons per minute failed to keep the excavation dry. A year and a week elapsed ere the work was complete. The demand of the men in May, 1863, seems to have been acceded to, as we find that on April 9, 1864, another strike occurred, and that ten days later the men returned at the same wage as before, $1.50 per day. On May 2, 1864, their pay was raised to $1.65, and even this did not conciliate, for on June 1 another strike occurred. The laborers then got notice that the permanent men would get $1.66 and the transients $1.50 per day. The dam was finished on June 17, 1864, just eighty-nine years after Bunker hill day, and the pon
June 17th, 1864 AD (search for this): chapter 10
elapsed ere the work was complete. The demand of the men in May, 1863, seems to have been acceded to, as we find that on April 9, 1864, another strike occurred, and that ten days later the men returned at the same wage as before, $1.50 per day. On May 2, 1864, their pay was raised to $1.65, and even this did not conciliate, for on June 1 another strike occurred. The laborers then got notice that the permanent men would get $1.66 and the transients $1.50 per day. The dam was finished on June 17, 1864, just eighty-nine years after Bunker hill day, and the pond began to fill. Water was not the only thing to rise, as we note that on July 1 the laborers' pay was increased to $1.80 per day, and no strike is mentioned. These were the days of the Civil War, when the high cost of living was equally apparent with present-day experience. At 1.30 A. M., September 30, 1864, the stop planks were put permanently into the dam and the water allowed to rise to the required elevation. This chang
the level of the lower lake has been reduced (and consequently its area, slightly), and as the tides no longer come, the water is no longer salted. That the work of building this dam, with its waste weir, conduits and gate-house was substantially performed is evident even to the casual observer. Though disused since 1897 it is well cared for, and the new lake thus created is kept at the normal height. Just here we digress a little from our subject, to quote from Mr. Brooks' History of 1855:— The lands on each side are slightly elevated, and in future times will doubtless be filled with country seats. Today sees something of fulfilment of his prophecy. Writing over sixty years ago he did not foresee the electric light or railway on the farther side, nor yet the broad parkway on the other, or the swift automobiles almost momentarily traversing its course. The present limits of its Medford border are only within a few years invaded by dwellings, but the Baconville of which h
1 2 3 4 5 6